

Bar Blu
High Rollers and VVIP reception lounge, Highland Hotel.
Located 250km from Kuala Lumpur City and on top of Genting Highland resort. Due to a short construction time, the 30 ton tank had to be prefabricated off-site and logistically put in place within 24 hours. Another hurdle was the excess point of the tank location is through a 5.5 x 3.5 m opening, to logistically fit a 12 x 3.8 x 3m, 30 ton tank into position. This was achieved in 17 hours and process can be seen on the next pages.